Tianjin Tanggu Jinbin Valve Co., ltd
Short delivery time

THT can make sure the short delviery for valves by below points.

1. There are large stocks for semi-finished products. If the orders confirmed, it just needs to do the test and surface coating again.


2. Many stocks for all kinds valve body and there are enough digital processing machines to minimize the delviery date.


3. Efficient technical team and have cooperated cast factory at the nearest to make sure the raw materials supplying.

4. Close to the sea port with 30 minutes driving to reduce the delviery time.